The chosen bidder will present vitality to GRIDCO for five years from technology-agnostic energy storage methods, ranging from April 1, 2026. The charging vitality for the ability storage system shall be offered by the developer.
The gathering of energy storage system builders for the complete functionality of two,500 MWh shall be carried out by aggressive tariff-based bidding, adopted by an e-reverse public sale course. The minimal bid dimension shall be 250 MWh and the utmost bid dimension shall be 1,250 MWh.